1 preparation, 2 before you proceed – Asus V2-AE1 User Manual

Page 18

Advertising
background image

2 - 2

2 - 2

2 - 2

2 - 2

2 - 2

C h a p t e r 2 : B a s i c i n s t a l l a t i o n

C h a p t e r 2 : B a s i c i n s t a l l a t i o n

C h a p t e r 2 : B a s i c i n s t a l l a t i o n

C h a p t e r 2 : B a s i c i n s t a l l a t i o n

C h a p t e r 2 : B a s i c i n s t a l l a t i o n

2.1

Preparation

Before you proceed, make sure that you have all the components you plan
to install in the system.

Basic components to install:

Basic components to install:

Basic components to install:

Basic components to install:

Basic components to install:

1.

Central processing unit (CPU)

2.

DDR Dual Inline Memory Module (DIMM)

3.

Expansion card(s)

4.

Hard disk drive

5.

Optical drive

6.

Floppy disk drive

T o o l

T o o l

T o o l

T o o l

T o o l

Phillips (cross) screw driver

2.2

Before you proceed

Take note of the following precautions before you install components into
the system.

Use a grounded wrist strap or touch a safely grounded object or a
metal object, such as the power supply case, before handling
components to avoid damaging them due to static electricity.

Hold components by the edges to avoid touching the ICs on them.

Whenever you uninstall any component, place it on a grounded
antistatic pad or in the bag that came with the component.

The motherboard comes with an onboard standby power LED. This LED
lights up to indicate that the system is ON, in sleep mode or in soft-off
mode, and not powered OFF. Unplug the power cable from the power outlet
and make sure that the standby power LED is OFF before installing any
system component.

®

Onboard LED

SB_PWR

ON

Standby

Power

OFF

Powered

Off

Advertising