Setting up the system, Pre-installation requirements – Acer Altos G540 M2 User Manual

Page 41

Advertising
background image

31

Setting up the system

Pre-installation requirements

Selecting a site

Before unpacking and installing the system, select a suitable site for
the system for maximum efficiency. Consider the following factors
when choosing a site for the system:

Near a grounded power outlet

Clean and dust-free

Stable surface free from vibration

Well-ventilated and away from sources of heat

Secluded from electromagnetic fields produced by electrical
devices such as air conditioners, radio and TV transmitters, etc.

Checking the package contents

Check the following items from the package:

Acer Altos G540 M2 system

Acer EasyBUILD

TM

DVD Pack

Acer Altos G540 M2 accessory box

System keys

If any of the above items are damaged or missing, contact your dealer
immediately.

Save the boxes and packing materials for future use.

Advertising