Rack mounting procedure, Rack mounting procedure -3, Preliminar y – Extron Electronics MGP 462xi Series User Manual

Page 17

Advertising
background image

2-3

MGP Series • Installation

PRELIMINAR

Y

Mechanical loading

— Mount the equipment in the rack so that uneven

mechanical loading does not create a hazardous condition.

Circuit overloading

— When connecting the equipment to the supply

circuit, consider the connection of the equipment to the supply circuit and

the effect that circuit overloading might have on overcurrent protection and

supply wiring. Consider equipment nameplate ratings when addressing this

concern.

Reliable earthing (grounding)

— Maintain reliable grounding of rack-

mounted equipment. Pay particular attention to supply connections other

than direct connections to the branch circuit (such as the use of power strips).

Rack mounting procedure

For optional rack mounting, do not install the rubber feet. Mount the MGP in the

rack as follows:
1

.

Attach the included rack/through-desk mounting brackets (part #70-155-01)

to the unit, using eight of the machine screws supplied with the mounting kit.

(See the illustration below.)

2

.

Insert the unit into the rack and align the holes in the mounting brackets with

the holes in the rack. Use four machine screws to attach the brackets to the

rack.

MBD 249

2U Rack Mounting
Bracket (Use four
lower holes.)

Rack mounting an MGP 464/462xi

Advertising
This manual is related to the following products: