Installation

5.3 Connecting

pipes

a) When on vacuum operation (F-CEV-S) connect

the suction pipe at (Fig. 2/A) and when on pres-
sure operation (F-CEV-D) connect the pressure
pipe at (Fig. 2/B).

NOTICE

Long and/or small bore pipework should be
avoided as this tends to reduce the capacity of
the blower.

Radial blowers must only be operated under
a throttled condition to avoid motor overload.
The units should not be used when not con-
nected to a system.

b) Check to ensure the intake line and pressure

connection are connected correctly.