29

9400004-J0 Rev B

4.1.2 Installation component requirements

Supplied

• Internal cabling

Not Supplied

• Concrete and metal grating mounting hardware
• AC electrical conduit, cable and fittings
• External DC conduit, cable and fittings
• Auxiliary frame (2" x 9/16") for external battery return busbar kit

4.2 Tools and Test Equipment

Insulated tools are essential for a DC power system installation. Use the following list as a guide:
• Electric drill with hammer action
• Digital voltmeter equipped with test leads
• Lap top computer with Internet Explorer 8 for communication with the Cordex Controller (not required for

initial installation and test)

• Various crimping tools and dies, to match lugs used in installation
• Torque wrench:1/4" drive, 0-150 in-lb for battery post connections
• Torque wrench: 3/8" drive, 0-100 ft-lb for system connections
• Insulating canvases as required (2' x 2', 1' x 1', 3' x 3', etc.)
• Cutters and wire strippers (#14 to #22 AWG) [2.5 – 34 mm

2

]

• Insulated hand tools listed below:

Combination wrenches

Ratchet and socket set

Various screwdrivers

Electricians knife

Fine tipped slot screwdriver (“tweaker”)

Cable cutters

4.3 Floor Loading

4.3.1 Concrete floors (for reference only)

Concrete floor installation requiring seismic compliance requires approval by the appropriate engineering disci-

pline, i.e., civil, structural etc. The thickness of the concrete should be evaluated to ensure that its weight carrying

capabilities meet the requirements.
Check the building floor plans for the presence of pipes, conduits, beams or any other obstructions in the con-

crete slab that could interfere with the drilling.
Figure 18 shows the dimensions and bolt locations of a single bay. An anchoring kit is provided with hardware for

the slots