Service journal – BlueBird SC550A_968999351 User Manual

Page 44

Advertising
background image

44

SERVICE JOURNAL

Action

Date, stamp, signature

Delivery service

1.

Break the packaging and make sure the machine has not been

damaged in transport.

2.

Where applicable, assembly accompanying components.

3.

Check that the machine design corresponds to the

customer order.

4.

Check that the right amount of oil is in the engine and

transmission.

5.

Check that the working equipment is properly set.

6.

Check that the drive pulleys and sprockets are aligned.

7.

Check that belts and chains are properly adjusted.

8.

Lubricate the machine as described in the lubrication schedule.

9.

Fill the fuel tank and start the engine.

10. Check that the machine and working equipment do not

move in neutral.

11. Check all operating instruments.

12. Check decals and information attached to the unit.

13. Check the engine speed (RPM), see Technical Data.

14. Check for leakage.

15. Inform the customer about:

The need and advantages of following the service schedule.

The need and advantages of leaving the machine for service

every 300 hours.

The effects of service and maintaining a service journal on the

machine’s resale value.

16. Fill in the sales papers, etc.

Delivery service has

been carried out.

No remaining notes.

Certified:

After the first 20 hours

1.

Change engine oil.

2.

Change oil in reduction gear, where applicable.

3.

Check that belts and chains are properly adjusted.

4.

Tighten screws and nuts.

Advertising