3. central process unit (cpu) installation – I-View Digi-4800XP 16 channels Hybrid Embedded DVR User Manual

Page 26

Advertising
background image

26

2-3.

Central Process Unit (CPU) Installation

2-3-1.

CPU Installations: Power Management Setup

The DVR’s board comes with a surface mount Socket 775 (LGA775) design for Intel Pentium 4

Processor in the 755-land package.

Follow the steps below for CPU installation

1.)

Locate the CPU socket on the platform. (Fig. 2-3.1).

2.)

Press the load lever with your thumb (A) and remove it to the left (B) until it is released from the

retention tab. (Fig. 2-3.2)

3.)

Lift the load lever in the direction of arrow to a 135-degree angle. (Fig. 2-3.3).

4.)

Lift the load plate with your thumb and forefinger to a 100-degree angle (A), and then push the

PnP cap from the load plate window to remove (B). (Fig. 2-3.4).

5.)

Position the CPU over the socket, making sure that the gold triangle is on the bottom-left corner

of the socket. The socket alignment key should fit into the CPU notch. (Fig. 2-3.5).

Fig.2-3-1.1

Fig.2-3-1.2

Fig.2-3-1.3

Fig.2-3-1.5

Fig.2-3-1.4

Fig. 2-3-1.6

Advertising