Model tp-70 service – PA Industries Transporter User Manual

Page 18

Advertising
background image

18

When reassembling, take care with the following:

1. Install Speed Adjustment Valve and align indent

for the Speed Adjustment Valve Locking Screw.

2. Remember to install the Front and Rear Cylinder

Urethane Washers T70-257 and T70-259.

3. Use the T70-436 Set Screws to adjust out any

play or looseness in the Slide Assembly before
tightening the Holder Screws.

6. Unscrew Valve Seals T40-010 and pull the seals

out. Check all seals and O-rings for wear, make
sure valve seals are flat, and Valve Rod T70-603
is straight.

1. Remove the Spanner Nut T70-216 from the Rear

Piston T70-601 and push the Piston inside the Cylinder.

2. Remove the eight (8) holder screws with a T40 Torx

wrench. Loosen the eight (8) Set Screws T70-436.
There is no need to remove the set screws.

3. Pull the Front and Rear Holders away from the Body

while holding the Outer Guide Assemblies to prevent
the Bearings from being lost. The Front Piston
T70-602 and Shock Absorber T70-407 will come out
with the Front Holder. The Speed Adjustment
Assembly will come out with the Rear Holder.

4. Now remove the Front and Rear Retaining Plates.

The Rear Piston can now be removed from the Body.

5. Back out the Speed Adjustment Valve Locking

Screw T70-311 and remove the Speed Adjustment
Valve T70-604.

Factory Repair & Rebuild Service

Return the Transporter by UPS Prepaid to our repair center.
After teardown and inspection, P/A Industries will notify you
of the recommended cost for spare parts and labor.

MODEL TP-70 SERVICE

Disassembly

Reassembly

Advertising