NewAir APH-4000PV User Manual

Page 5

Advertising
background image

5


instructions, and of the hazards involved. If this heater is used in a commercial or
rental installation, it is the responsibility of the purchaser to check with the local
codes for properly acquainting with the safety precautions and instructions.

Failure to comply with the precautions and instructions provided with this
heater can result in death, serious bodily injury and property loss or
damage from hazards of fire, explosion, burn, asphyxiation, carbon
monoxide poisoning. Be sure you understand all operation instructions
before attempting to operate or service this heater.

1. Assembly


Note: The assembly of this heater requires basic mechanical skills. Proper
assembly is the responsibility of the installer. All service and repair should
be done by a qualified person.

1.1

Tools required

8mm, 10mm, 11mm, 12mm Socket
#2 & #3 Phillips Head Screwdriver
Pliers or Channel Lock Pliers
Crescent or Open End Wrenches
Caution:
Do not use Teflon Tape or any thread sealing compounds where connections
between heater head to Fuel-Tube and Regulator / Hose assembly to Fuel-
Tube.

1.2 Unpacking

 

Remove the Fuel-tube, the Post and Heater burner assembly from the

Box 2 of 2.

 

Take out the heater burner assembly from the base assembly by removing the

three Hex-Nuts, Flat washers and Lock washers, then screw the nuts and
washers back onto the bolts at the top of the burner assembly.

 

Remove all shipping packaging foam on the components.

 

Check the fasteners, Regulator assembly and the Owner’s Manual provided

by the factory.

 

Remove the Reflector from the Box 1 of 2.

 

Check the heater for any shipping damage, if any is found, immediately

contact and return this heater to the dealer or distributor where purchased.

 

Retain all packaging material and carton until heater warranty has expired.

Any warranty returns require original packing and carton.

1.3 Component List

(see Figure 1)

Advertising