Setup and operation, A fast eight-step process – Climax FF6200 FLANGE FACER User Manual

Page 4

Advertising
background image

SETUP AND OPERATION

A Fast Eight-Step Process

This model is so fast and easy to set up that an experienced operator can usually mount the machine into the flange bore, align it, and

start cutting in less than an hour.

1

Measure the

bore diameter.

This will be used

to determine

the leg length.

2

Select the

appropriate

leg length and

foot.

3

Install setup

fingers.

4

Tighten legs.

5

Set machine onto

flange using setup

fingers. Lightly

tighten leveling

feet in the flange.

6

Extend feet into

flange. Indicate,

level and tighten

leveling feet and

stationary feet.

7

Install tool bit.

Connect to

power.

8

You are ready

to begin

machining!

Climax Portable Machining & Welding Systems Web site: climaxportable.com
Worldwide Phone:

1.503.538.2185 N. America Toll-Free: 1.800.333.8311 Fax: 1.503.538.7600 E-mail: [email protected]

page 4

Advertising