Starting, English – CEMB USA K9 User Manual

Page 7

Advertising
background image

7

Use and maintenance manual Rev. 04-2011

ENGLISH

Starting

3.

Starting

WARNING

B

EFORE

SWITCHING

ON

THE

MACHINE

,

MAKE

SURE

THAT

ALL

THE

CONNECTIONS

DESCRIBED

IN

THE

INSTALLATION

CHAPTER

HAVE

BEEN

MADE

CORRECTLY

.

T

HE

FOLLOWING

OPERATIONS

INVOLVE

A

POTENTIAL

RISK

FOR

THE

OPERATOR

,

GIVEN

THE

PRESENCE

OF

VOLTAGE

ON

THE

EQUIPMENT

. T

HE

P

ERSONAL

P

ROTECTIVE

E

QUIPMENT

DESCRIBED

IN

THE

INSTALLATION

MANUAL

MUST

BE

WORN

AND

WORK

MUST

BE

DONE

WITH

DUE

CARE

AND

ATTENTION

.

O

PERATIONS

MAY

ONLY

BE

PERFORMED

BY

A

SPECIALISED

TECHNICIAN

.

Before powering the machine, carry out the following

checks:

check that the balancing machine touches the floor

1.

at the three support points;

2. make sure that all the parts of the balancer are cor

rectly connected and fixed;

3. make sure that the parameters (voltage and frequency)

of the mains power supply are compatible with those

indicated on the rating plate of the balancer;

4. make sure the power cable is correctly connected;
5. make sure the machine shaft and flange hole are
clean.

CAUTION

A

NY

TRACES

OF

DIRT

MAY

AFFECT

BALANCING

ACCURACY

.

6. To switch on the balancer press the switch on the

left-hand side of the machine.

7. Position the wheel on the terminal with the inner part

facing the balancer;

8. Firmly attach the wheel to the balancer shaft using

the lock nut.

9. The pedal controls a mechanical brake which facili

tates locking the locking ring and positioning the

wheel for correction.

10. At this point, you can read the tyre measurements

and perform balancing.

Advertising