Tools required for installation parts – CHIEF FHP110, FHPV User Manual

Page 4

Advertising
background image

FHP110, FHPV

Installation Instructions

4

TOOLS REQUIRED FOR INSTALLATION

PARTS

#2

3/16" (included)
5/32” (included)

Hardware required - not included

- 3/8" x 3" (minimum length) Grade 2 lag bolts (Qty. 4)

- 3/8" Grade 2 washers (Qty. 4)

B (1)

A (1)

[Ceiling plate]

D (1)

[hardware bag]

E (1)

5/16-18 x 1/4”

1/4-20 x 1 1/2"

1/4”x 1/2” x.032”

C (1)

F(1)
3/16”

G (1)

5/32”

H (1)

[Ceiling mount assembly]

J (2)

[19" Cable sheath]

L (4)

M (4)

N (4)

P (4)

Q (4)

1/4-20

.50 x .194 x 3/4"

.50 x .194 x 3/8"

M4 x 20mm

M4 x 30mm

M4 x 12mm

Advertising