Assembly – CHIEF RFM Series User Manual

Page 5

Advertising
background image

Installation Instructions

RFM Series

5

ASSEMBLY

1.

Use eight press-in studs (H) and 1/4-20" lock nuts (G) to
secure four rack rails (C) to rack base (B). (See Figure 1)

Figure 1

2.

Use eight screws with washers (F) to fully secure four rack
rails (C) to rack base (B). (See Figure 2)

Figure 2

3.

Use eight screws with washers (F) and eight 1/4-20" lock
nuts (G) to secure four rack rails (C) to rack top (A). (See
Figure 3)

Figure 3

4.

Use eight screws with washers (F) to fully secure four rack
rails (C) to rack top (A). (See Figure 4)

Figure 4

(G) x 8

1

(C) x 4

(B)

(H) x 8

(C) x 4

(B)

(F) x 8

2

(G) x 8 (under rack top)

3

3

(F) x 8

(F) x 8

4

(A)

(C) x 4

Advertising