Installation, General, Electrical wiring – Fluid Components International ST100 Series HART User Manual

Page 6: General electrical wiring

Advertising
background image

ST100 Series HART

2

Fluid Components International LLC

Installation

General
For details on the general mounting, placement of sensor head and mounting options see the Basic User Manual, 06EN003400.

Electrical Wiring
Access the wiring terminal block by removing the rear electrical connection cover. This cover can be locked closed by the cover locking screw.

Release the cover locking screw and remove the cover.
Cable access to wiring connections is obtained through one of the four conduit outlets, see figure 6 below.

Figure 1 - HART Output Wiring Table

The HART connections for the ST100 are located in the back panel. The connector for the HART is P1A; the pins are labeled “CH1” and “RTN 1/2”.

The ST100 HART connections are non- polarized, but polarity needs to be observed for other manufacturer’s devices. Connect the HART bus cable as

noted below. See Appendix A for Channel 1 HART Connections on instruments shippped before April 2012.

Figure 6 - Instrument Wiring

CH1

(INT)

CH1 *

(EXT)

CH2

CH3

1

2

4

6

3

5

(+)

(-)

(+)

(-)

(+)

(-)

(+)

(-)

ANALOG OUTPUTS

HART OUTPUT IS ALWAYS ON CH1

* Note: The (+) and (-) denote polarity

connection to the External Power Supply.

C01074-1-1

ANALOG INTERFACE BOARD.

CONFIGURATION SHOWN FOR REFERENCE

See Appendix A for Channel 1 HART

Connections on instruments shippped

before April 2012.

Advertising