Fluid Components International VORTAB User Manual

Page 6

Advertising
background image

VORTAB

®

Company

VORTAB Flow Conditioner

This page is subject to the proprietary rights statement on the last page

6

Doc. No. 06EN003269 Rev. D

When using the VIP upstream from flow meters other than FCI insert flow meters, whether it be in insert or flange mounted, such as turbine, annubar,

and ultrasonic flow meters, orientation is not critical but should mimic that which was calibrated. The VIP should be positioned upstream from the

flow meter in the orientation and distance in which it was calibrated.

The VIP is secured in place by way of sandwiching between flange faces. This will require two customer-supplied gaskets of which one will be

placed on each side of the VIP prior to installation. See Figure 2-4. The orientation tabs and/or orientation handle can be used to facilitate symmetric

installation of the VIP. Bolt flanges together to complete the installation.

Figure 2-4. Installation and Orientation of Flange Mount VIP

Weld-In-Place VIP

Orientation of the VIP with respect to an insertion flow meter is important. Refer to Figure 2-5 for both correct and incorrect installations of the weld

in place VIP with respect to an insertion flow meter.

Figure 2-5. Orientation of Weld-In-Place VIP