CAME Gard12 User Manual

Page 4

Advertising
background image

- pag.

- pag.

- pag.

- pag.

- pag.

4

4

4

4

4

- english -

- english -

- english -

- english -

- english -

DESCRIPTION OF ASSEMBLY PROCEDURE

1 - ASSEMBLY OF FIXED STRUCTURES, MARKING

a) determine the desired positions
for the housing as well as for the
fixed support for the barrier bar;
mark the longitudinal and
transverse axes of the barrier.

c) Sink everything into the
relative cement bases. Be
sure that the mounting base is
perfectly level, and that the
electrical cables for the unit
protrude in the area indicated.

b) detach the mounting base
from the housing and mount
the anchor stays on the base;
apply grease and/or removable
tape to protect the threaded
bolts protruding from the top.

anchor
screw

mounting nut
and washer

UNP 65x42
profile of
mounting base

profile of cement base

580

120 x 120

axis of

barrier bar rotation

axis of support
for barrier bar

longitudinal axis of barrier

recommended
area for cable exit

235

865

L

N

= USEFUL NET WIDTH OF PASSAGE = 11850 mm MAX

6500 mm MIN

anchor stay

Advertising