Cashco Ranger QCT User Manual

Page 5

Advertising
background image

IOM-Ranger

5

FIGURE 3:

Insulated Body

Flangeless Design

NOTE: The bon net of
in te gral ly fl anged bod-
ies should also not be
in su lat ed

SECTION IV

compliance with/to Spec. No. S-1134, the
valve is suitable for oxygen service. This pro-
ce dure is limited to bodies of SST material

B. Trim

Removal:

Access to the cage assembly with internal trim

pieces may be accomplished without removing

the actuator assembly (AA). Thus, it is not nec es-

sary to remove the pack ing set (13) or the stem

subassembly (7) to change internal trims. NOTE:

Plug (6) must be in the closed position to remove

the trim.

IV. MAINTENANCE

A. General:

1. Maintenance procedures hereinafter are based

upon removal of the valve/actuator unit from
the piping where installed.

2. Owner should refer to owner’s procedures for

re mov al, handling and cleaning of non re us able
parts; i.e. gaskets, suitable solvents, etc.

3. Valves supplied from the factory do not use

any aid to assist in gasket sealing such as oil,
sealant or pipe dope.

4. Valves originally supplied per Opt-55 require

spe cial cleaning procedures. Refer to Cashco
Specifi cation No. S-1134 for details. When in

E. Packing

Check:

1. Ensure

that

packing

fl ange nuts (22) have not

worked loose during shipment.

2. For non-live loaded construction, hand tight en

the nuts (22) enough to stop any leakage. Do
not over tighten.

3. For live loaded construction, if spacer ring

(29) is loose, tighten both nuts (22) equally

until spacer ring (29) no longer “spins freely”
using two fi ngers. Rotate both nuts (22) ad-
di tion al 1/2 revolution for correct packing
load. See Figure 9 for correct orientation of
live-loaded packing design.

F.

Insulation:

1. Insulate the valve body only. Do not insulate

the integral extension bonnet as this could
result in premature packing failure in low or
high temperature services. See Fig ure 3.

Advertising