14

Installation

3.3 Mechanical installation

Select a suitable place to install the instrument. Plan the
mechanical installation before positioning posts or drilling holes.
Refer to

Figure 1

for instrument dimensions.

Make sure that the fastening has sufficient load bearing capacity
(approximately 160 kg). The wall plugs must be selected and
approved to suit the properties of the wall.

Plan cable and tubing routes to avoid sharp bends and tripping
hazards.

When connecting two analyzers (e. g. for measuring two
parameters with a FILTRAX or Ultrafiltration), plan where the
instruments are to be installed and consider the length of the
heated drain tubing (2 m).

3.3.1 Mount the instrument

The PHOSPHAX sc can be mounted in three different ways:

Wall Mount (

section 3.3.1.1

),

Rail Mount; refer to the instruction sheet supplied with the
Rail Mounting Hardware.

Stand Mount; refer to the instruction sheet supplied with the
Stand Mounting Hardware.

3.3.1.1 Wall mount

Refer to

Figure 5

,

Figure 6

, and following instructions to mount the

analyzer to a wall.

1. Align and install the fastening bracket to the wall.

2. Attach the angle bracket to the instrument using the

supplied screws.

3. Slide the bottom of the enclosure onto the fastening bracket.

4. Attach the enclosure to the fastening bracket.

5. Attach the angle bracket on the enclosure to the wall.