Sections MUST lay flat, even, straight and centered on concrete.

3.1 Connect Sections Together on Concrete Pad

SECTION 3 - AUTO SPIKE SYSTEM INSTALLATION

The operator and auto spike system must be installed on a flat and level concrete pad with a minimum 6 inch depth (Check local
building codes for restrictions). Reinforced concrete recommended. It is recommended that the “Spike” sections not exceed
9 feet (Three 3-Ft spike sections) for proper operation.

Snap all sections together using male-to-female socket connectors with spikes aligned in UP position.
DO NOT anchor them to the concrete at this time.

Traffic Direction

Note: Operator shown
mounted on the LEFT side
of traffic lane (preferred).

The spikes will retract towards oncoming traffic.

The spikes will be reversed from the left side mounting position and retract away from oncoming traffic.

Operator Mounted on

LEFT

Side of Traffic Lane Preferred

Operator Mounted on

RIGHT

Side of Traffic Lane

Male-to-Female Socket Connectors