2 pad mount operator – Controlled Products Systems Group 6050-080 User Manual

Page 14

Advertising
background image

Page 4

X Y

Gate

Width

34 32 14

Ft.

30 28 12

Ft.

26 24 10

Ft.

1.2.2 PAD

MOUNT

OPERATOR

1.

Using Table 2 and Figure 5 determine the location
of the concrete pad and mounting plate. The
location of the pad and base plate and the Y
measurement is dependent on the X
measurement that you choose.

2.

X is the measurement from the center of the gate
hinge to the center of the gate bracket and
defines the position of the A1 and A2 points.

3.

Once the location of the pad and base plate has been determined, construct a form
for the concrete pad according to Figure 6. Note that the depth of the pad is
determined by soil conditions and local building codes. The pad is sized so that there
is four (4) inches of concrete around the mounting plate when it is installed on the
pad.

4.

IMPORTANT!! Be sure that the top of the pad is level.

5.

Let the concrete cure for 48 hours before proceeding with the installation of the gate
operator.

6.

Anchor the concrete mounting plate to the pad using eight (8) 3/8 x 3 sleeve anchors
(not supplied). It is important that the concrete base plate is located correctly on the
pad so that the A1-A2 line will intersect the operator output shaft as shown in Figure
5.

Table 2

X

Gate Closed

Gate Open

90°

Fence

Pilaster

A2

A1

Y

Gate

Bracket

12

C

oncrete

Mounting Pad

24

26

Point C is centered

1.5 inches in front of

the mounting plate.

See detail A.

A1-A2 Line

Output

Shaft

Point C

Detail A

1.5

4

Figure 5

Advertising
This manual is related to the following products: