4 installation #1, Operator mounted directly on a concrete pad, Gain access inside operator – Controlled Products Systems Group 9210-081 User Manual

Page 15: Important

Advertising
background image

9210-065-F-4-12

13

1.4 Installation #1

Remove the limit assembly guard.

Remove the 3 locknuts inside the
electronic box to swing box open.

W

ARNING

MO

VI

NG

GA

TE

CAN

CA

USE

Op

era

te g

ate

on

ly w

hen

ga

te a

rea

is i

n s

igh

t

and

fre

e o

f pe

ople

an

d o

bstr

ucti

ons

.

Do

no

t all

ow

ch

ildr

en t

o p

lay

in g

ate

are

a

or o

per

ate

ga

te.

Do

no

t sta

nd i

n g

ate

pa

th o

r w

alk

thro

ugh

path

w

hile

ga

te is

m

ovin

g.

Rea

d o

wn

er’s

m

anu

al a

nd s

afe

ty in

stru

ctio

ns.

SE

RI

OUS I

NJ

URY OR

DE

ATH

CLA

SS

CER

TIF

IED

TO

CA

N/C

SA

C2

2.2

NO

. 2

47

CO

NF

OR

MS

TO

AN

SI/UL

-32

5

VEHIC

UL

AR

GA

TE OP

ERA

TOR

HP

533

82

MO

DE

L

SER

IAL

VO

LTS

PH

AS

E

AM

PS

60 H

z

MA

X G

ATE

LO

AD

Door

King

, In

c., I

nglew

ood,

CA

Limit Assembly Guard

Electronic Box

Tip: Trace the base plate of the operator on a
piece of masonite (Not provided) and make a
template to help locate where the conduit runs
will be positioned in the concrete pad.

Caution: DO NOT lay the operator on it’s
side or oil will leak out of the gear reducer.

The operator is heavy. Two persons are required
when handling the operator during installation.

Pad depth is determined by
soil conditions and local
building codes. Minimum
depth is 18 inches.

Reinforced concrete
recommended.

DO NOT set anchor bolts in
wet concrete. Sleeve anchors
should be used after concrete
has cured for greater
flexibility in positioning the
operator on the pad.

23”

6.75”

10.75”

7.5”

4”

4”

12”
16”

16.75”

11.25”

20.5”

11.75”

4” Minimum Above Ground

28”

Concrete Pad

Gain Access Inside
Operator

Concrete Pad

Conduit

Conduit suggestions:

High voltage conduit

Low voltage access control device conduit

Automatic exit loop conduit

Reverse loop conduit

Base Plate

Conduit

Area

Conduit

Area

Conduit

Area

Gate

1”

1

2

3

1”

Masonite T

emplate

Not Provided

Important:

Operator

MUST be parallel to gate!

Concrete pad
MUST be level!

1/2

To attach operator to
concrete pad DoorKing
recommends twelve (12)
1/2” x 3” sleeve anchors
(not supplied).

Operator Mounted Directly
on a Concrete Pad

18”

20”

Wire Mesh

Advertising
This manual is related to the following products: