STEP 1-MOUNTING THE UNIT

Page 3 tells you what tools and instruments you will need to install your unit and presents a parts check list. Make sure
to have all the tools listed. Upon opening the box, check off the items enclosed with the unit. If any items are missing
from your unit, contact American Access Systems immediately.

Mounting the unit to an AAS gooseneck (18001) or double height (18003)pedestal
Locate the four carriage bolts and four hex nuts found inside the unit box. Place the unit up to the pedestal flange
and insert the four carriage bolts from the backside. Secure the unit to the pedestal using the four hex nuts and a
7/16” socket. The extra square mounting flange may be discarded.

STEP 2-SYSTEM CONNECTIONS

Study the WIRING COLOR CODE chart below and then proceed to the hookup steps.

WIRING COLOR CODES

WHITE(AC Hot)(DC +)

12 - 24 VOLTS

WHITE(AC Neutral)
(DC -)

AC or DC

LATCH CONTACTS

BROWN

RELAY COMMON

ORANGE

NORMALLY OPEN

BLUE

NORMALLY CLOSED

HOOKUP STEPS

(A). Your DKLP control unit operates on 12 to 24 volts AC or DC. Measure the voltage from the power source to
make sure it falls within these tolerances. Locate the two white wires on the circuit board and with the power off
connect them to a constant power supply.