EQUIREMENTS

24 Volt AC

The power connection for the machine is on the circuit

board. The terminal block for incoming power is locat-

ed on the lower left corner of the Circuit Board. You

will have to lift up the Cover/Instruction sheet to locate

this terminal block, which is black in color.

BE CERTAIN TO SUPPLY 24 VOLTS/AC

T

RANSFORMER

P

OWER

R

EQUIREMENTS

The minimum power required for each vender is 1/2

amp (500mA). To run multiple venders on a transformer

first determine the total amperage required, taking into

account future additions. To determine the amperage

output of a 24 volt transformer that is given in VA, divide

the VA output by 24. For example, a 100 VA transformer

would provide 4.2 amps (100÷24) of 24 volts AC power.

This would be ample power for 8 venders.

I

NSTALLATION

The vender can be mounted on any vertical surface

without removing any part of the unit. Any standard

fastener not larger than 3/8” diameter such as wood

screws, expansion bolts, machine bolts or carriage

bolts can be used depending on the type of wall. The

vender weighs 45 lbs. empty.

The top two fasteners should be loosely installed in

the wall with the heads of the fasteners projecting out

approximately 1/4” from the wall. Raise the top shelf

of the magazine into its vend position to expose one

of the two top mounting holes in the back of the

cabinet. The keyhole shape of the mounting holes will

permit you to hang the cabinet on the two fasteners.

While in this unsecured position, mark the bottom two

mounting holes on the wall to accurately align the

lower fasteners, if necessary remove the cabinet.

Install the bottom fasteners to secure the cabinet.

Shelf Actuator

399-A90

See Step #3

Trip Bar

2100-3

Actuating Arm

2100-12

Magazine

Assembly

399-D1

R

ETRO

F

IT

K

IT

I

NSTRUCTIONS

You do not need to take down your mounted cabinet.
Also, the Magazine Assembly can stay mounted inside
the Cabinet.

1. Remove existing Door and Security Frame from the Cabinet.

Assemble new Door on existing Cabinet and replace the

Security Frame from your old Door.

2. Remove 3 screws holding mechanical Coin Mechanism.

Loosely reinstall these 3 screws. Now remove existing Empty

Lock Rod, which is hanging down the left side of the

Magazine Assembly. This Rod will not be needed.

3. Detach Spring from side of Magazine Assembly – this is not

needed in new electronic system.

4. Shelf Actuator has double faced tape applied to it, you need

to peel back the top layer to expose the adhesive. Now apply

the Actuator on to the Trip Bar at the dimension indicated in

the diagram – (9

1

4

” from the top of the Coin Box Holder to

the bottom of the Actuator)

5. Drill

1

4

”–

1

2

” hole in back of Cabinet to be used for bringing

the power cord in.

Leave ample extra wire.

6. Mount electronic Coin Mechanism over the 3 screws you

loosely installed in Step #2 and tighten screws. The keyhole

shape of the holes in the Coin Mechanism front flange allow

you to remove and install the Coin Mechanism without taking

the screws out.

IMPORTANT – when installing the new Coin Mechanism
the round cam of the Vend Motor must go inside of the
Shelf Actuator’s flanges.

7. To install new Empty Rod it is recommended to first insert

bottom of Rod through the guide hole at the top of the

Coin Mechanism (above the Empty Switch). Now insert

top of Rod as before (identical to mechanical system).

Before resetting the shelves lift rod up to see if it falls

freely and trips the Empty Switch.

2