Parts and hardware listing, Fig. 4.0 - az/el cap mount, La d – Andrew TYPE 100 User Manual

Page 5

Advertising
background image

;;

;;

;;

;;

;;

;;

L

A

d

36

(B)

1" to 2"
SLOPE FOR
WATER RUN OFF

GRADE

#3 REBAR X DIA. OF PIER,
INSERT THRU HOLE IN
TUBE & CENTER

BELOW
FROST LINE

MIN.
DIA.

NOTE:

Clearance

increases at

elevations

greater than 23˚.

3" O.D.

PIER
FOUNDATIONS

;;

;;

;;

;;

;;

;;

;;

;;

;;

;;

;;

;;

;;

L

A

d

48"
(B)

1" to 2"
SLOPE FOR
WATER RUN OFF

GRADE

#3 REBAR

LENGTH = d MIN LESS 1"

INSERT THROUGH

HOLE IN TUBE & CENTER

(4) #3 x 24" MIN.

AT 90˚ APART

(SEE NOTE)

BELOW
FROST LINE

MIN.
DIA.

NOTE:

48" may be

increased, concrete

and length of rebar

will increase

accordingly.

3" O.D.

DEEP
FROST LINE
FOUNDATIONS

;

;

;;

;;

;;

(SEE NOTE 2)

1-1.5"

APPROX.

2"

;;

;;

OPTIONAL

10

PARTS AND HARDWARE LISTING

8.04 REF

11.80 REF

8.13 REF

FIG. 4.0 - AZ/EL CAP MOUNT

GROUND POLE INSTALLATION

3” O.D. x 68” & 72” LONG

ANT

WIND VEL.

DIM “L”

DIM “A”

DIM “d”

CONC VOL.

DIM “L”

DIM “A”

DIM “d”

CONC VOL.

GROUND POLE

80 MPH

9”

1.5 FT

3

7”

1.2 FT

3

90 MPH

11”

2.2 FT

3

7”

1.2 FT

3

90cm

110 MPH

68”

37”

13”

3.0 FT

3

68”

37”

8”

1.5 FT

3

Mo. 611652731

110 MPH

15”

4.0 FT

3

10”

2.4 FT

3

See Note 2

125 MPH

18”

5.8 FT

3

12”

3.5 FT

3

80 MPH

10”

1.8 FT

3

7”

1.2 FT

3

90 MPH

13”

3.0 FT

3

8”

1.5 FT

3

1.0M

110 MPH

68”

37”

15”

4.0 FT

3

68”

37”

10”

2.4 FT

3

Mo. 611652731

110 MPH

17”

5.2 FT

3

11”

2.9 FT

3

See Note 2

125 MPH

20”

7.2 FT

3

14”

4.7 FT

3

80 MPH

14”

3.5 FT

3

9”

1.9 FT

3

90 MPH

17”

5.2 FT

3

11”

2.9 FT

3

1.2M

110 MPH

72”

39”

19”

6.5 FT

3

72”

39”

13”

4.1 FT

3

Mo. 611685101

110 MPH

22”

8.7 FT

3

15”

5.4 FT

3

See Note 2

125 MPH

25”

11.2 FT

3

19”

8.7 FT

3

PIER FOUNDATIONS

DEEP FROST LINE FOUNDATIONS

POLE SPECIFICATIONS:

3” O.D. x .120 Wall x 68” Long Steel w/Powder Paint Finish - CM PN 611652731.

3” O.D. x .148 Wall x 72” Long Steel w/Powder Paint Finish - CM PN 611685101.

1. Pole and foundation design based on the following criteria: (a) Uniform Building Code Exposure C and 1.5 stability factor, (b) Vertical

soil pressure of 2000 pounds per square foot, (c) Lateral soil pressure of 400 pounds per square foot, (d) Concrete compressive
strength of 2500 pounds per square inch in 28 days.

2. If Model 6851 (3” x 72”) is used for 90cm and 1.0m Antenna Dimension “B” on pier foundation must be increased by 4” and concrete

volume will increase accordingly.

3. CAUTION - The foundation design shown does not represent an appropriate design for any specific locality since soil conditions vary

and may not meet design criteria given in Note 1. You should consult a local professional engineer to determine your soil conditions
and appropriate foundation.

3

ITEM

DESCRIPTION

QTY.

1

MOUNT ASSY AZ-EL CAP 2

⁷⁄₈”-3” MAST

1

3

CLAMP HALF 2

⁷⁄₈”-3” AZ-EL

2

4

HOUSING AZ-EL CAP MOUNT

1

5

BOLT, M8 x 130mm HEX HEAD

1

6

NUT, SWIVEL, SPECIAL M8

1

7

BOLT, M8 x 20mm, CRG

3

8

BOLT, M8 x 30mm, CRG

4

9

WASHER,

⁵⁄₁₆” FLAT

7

10

NUT, M8, HEX

1

11

WASHER, SPHER., DELRIN

1

12

NUT, M8 ELASTIC STOP (ESNA)

8

13

LABEL, ELEVATION ADJUSTMENT

1

Advertising