Preparation for operation and start-up, J. preparation for operation and start-up – ADC AD-115ES User Manual

Page 35

Advertising
background image

113202 - 10

www.amdry.com

31

The manual ball cock shutoff valve must be located outside of the dryer at a distance from the dryer where it
is easily accessible.

3. Electrical Requirements

No independent external power source or supply connection is necessary. The 24 volt power to operate the
fire suppression system is accomplished internally in the dryer (from the dryer controls).

WARNING: Electrical power must be provided to the dryer at ALL times. If the main electrical

power supply to the dryer is disconnected, the fire suppression system is
INOPERATIVE!!

J. PREPARATION FOR OPERATION AND START-UP

The following items should be checked before attempting to operate the dryer:

1. Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2. Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label. In case of

208 VAC or 230/240 VAC, the supply voltage must match the electric service exactly.

3. GAS MODELS – check to ensure that the dryer is connected to the type of heat or gas indicated on the

dryer data label.

4. GAS MODELS – the sail switch damper assembly was installed and adjusted at the factory prior to

shipping. However, each sail switch adjustment must be checked to ensure that this important safety
control is functioning.

5. Check to be sure drive belts between idler pulley and motor pulley have been reconnected.

6. GAS MODELS – be sure that ALL gas shutoff valves are in the open position.

7. Be sure ALL back panels (guards) and electric box covers have been replaced.

8. Check ALL service doors to ensure that they are closed and secured in place.

9. Be sure lint drawer is securely in place.

NOTE: LINT DRAWER MUST BE ALL THE WAY IN PLACE TO ACTIVATE SAFETY

SWITCH OTHERWISE THE DRYER WILL NOT START.

10. Rotate the basket (tumbler) by hand to be sure it moves freely.

11. Check bolts, nuts, screws, terminals, and fittings for security.

12. STEAM MODELS – check to ensure air supply (80 psi [5.51 bar]) is on the dryer.

13. STEAM MODELS – check to ensure ALL steam shutoff valves are open.

14. STEAM MODELS – check steam damper operation.

15. Check basket (tumbler) bearing setscrews to ensure they are ALL tight.

Advertising