Acer Network Device Altos R520 User Manual

Page 59

Advertising
background image

49

To install the power distribution board cover:

1

Observe the ESD precautions and pre-installation instructions
described on page 39.

2

Lower the power distribution board cover to the chassis (A).

3

Tighten the thumbscrew to secure the cover to the chassis (B).

4

Observe the post-installation instructions described on page 40.

A

TP02229

B

Advertising