65 7 a 4 – Dixon Valve 50 TON RAM SEC02 External Swaged Holedall User Manual

Page 4

Advertising
background image

50 Ton Ram Instruction Manual

1¼" through 4" Standard & Long Holedall Swaged Couplings

customer service

800

355

1991

2

Section 2

Lubricate the outside of the ferrule with Crisco®
(recommended) or high viscosity oil or heavy duty
grease.

Assuring that the hose end is cut square, chamfer
the I.D. of the hose 1/8" at a 45° angle. This will aid
in stem insertion. If the hose is to be static
grounded, follow hose manufacturers procedure for
proper static grounding.

Lubricate the I.D. of the hose and the O.D. of the
stem with Dixon Coupling Lubricant or equivalent.
Insert the stem all the way into the hose until the ring
on the stem comes in contact with the end of the
hose.

6

5

7a

4

Slide the ferrule over the stem and over the O.D. of
the hose until the turned over portion of the ferrule
rests on the ring of the stem.

Advertising