Installation – Poweramp PIT MOUNTED TRUCK SPECIALTY User Manual

Page 4

Advertising
background image

I.

DRAWINGS INCLUDED IN PACKET
A.

TRUCK LEVELER

1.

PLPHBOT PIT DETAIL

2.

PL18230 INSTALLATION GUIDE

3.

9080 ELECTRICAL DRAWING

4.

HSPTL HYDRAULIC SCHEMATIC

5.

8585-0038 HYDRAULIC COMPONENTS

6.

POWERPACK SPECIFICATION SHEETS

II.

RECEIVING

A.

Verify that the received parts match the packing slip. Any missing or
damaged items should be reported to the freight carrier.

III.

INSTALLATION

A.

Locate and weld pivot channel weldment as shown on PL18230/

B.

Locate and anchor cylinder mounting weldments using 5/8" x 5
anchors (2) as shown on PL18230

C.

Anchor hydraulic power unit on pit floor between cylinder locations
(as shown).

D.

Install hoist cylinders in mounting weldment and secure with bolted
tie-bars.

E.

Connect hose assemblies from cylinders to "T" on top of pump/
valve assembly.

F.

Using four (4) lift points, position platform so that:

1.

Platform pivot points (4) nest securely in slots of channel
weldments.

2.

Hydraulic cylinder rod ends nest securely in trunnion slots
under platform.

G.

Install electrical control box.

H.

Connect field wiring as indicated on 9080.

I.

Test Unit.

J.

Attach toe guards to platform.