Earthway S25 SPRAY-PRO PUSH SPRAYER User Manual

Earthway, Spray-pro

Advertising
background image

Rotate wheel

to help

install pins

Steel Ring

Flat Washer

Slide one knurled pin into each slot

in the hub and then spray with WD-40

or a light oil and slide wheel in fully and

secure with a cotter pin

1” Cotter Pin

Coast Wheel

Drive Wheel

1” Cotter Pin

S25

SPRAY-PRO

PUSH SPRAYER

ASSEMBLY and OPERATING INSTRUCTIONS

SPRAY-PRO

SPRAY-PRO

EarthWay

R

EarthWay

R

SLIDE

Lower

Handle

Axle Bushing

Congratulations on the purchase of this new sprayer from Earthway Products, Inc. Please call us if you have any difficulty

with assembly or operation of this sprayer. We can be reached via the telephone at 800-294-0671 or 574-848-7491, Monday

- Friday 9:00am ~ 4:00pm or visit us online at www.earthway.com This sprayer comes with lifetime technical support,

email us at [email protected].

HELPFUL HINTS: READ THE DIRECTIONS BEFORE ASSEMBLY

THIS SPRAYER COMES PARTIALLY ASSEMBLED, REQUIRING YOU TO INSTALL THE WHEELS, HANDLE ASSEMBLY,

SPRAY GUN HOLDER, AND CONTROL ROD. IT SHOULD TAKE APPROXIMATELY 15 MINUTES WITH THE USE OF TWO

7/16” WRENCHES AND 1 PAIR OF PLIERS.

5

Your sprayer is designed to be pushed at three miles per hour, which is a brisk walking speed. Slower or faster speeds

will change the spray patterns and output volumes that you will achieve.

5

Clean your sprayer tank thoroughly after each use. Wash with clean water and push sprayer several feet to evacuate any

residual materials until you see clean water. Do this in a safe area as described in the chemical supplier directions.

5

Gears are permanently lubricated at the factory. Do not open the gearbox or dirt may enter.

5

Check all hose connections regularly to ensure they remain tight.

5

If unit fails to spray on initial use, or leaks from the nozzle, remove the cap from the top of the DCV, wipe off the top of

DCV body to remove any debris, and then replace the cap and tighten.

5

Coat all metal surfaces (inside & outside of chassis) with light oil or silicon spray to help prevent corrosion.

5

When the tank is empty, PULL THE SPRAYER BACKWARD to the designated cleaning or storage area to prevent

damage that can occur with a dry pump.

2. Turn the S25 upside-down on to the tank.

3. Ensure that the Axle Bearings are pushed into the Axle Bushing on both sides as shown

at the right. Install the Coast wheel (this wheel does not have the steel ring on the inside

hub as shown below) on to axle using the cotter pin hole closest to edge of the axle.

Insert 1” cotter pin through the axle and bend with pliers to prevent pin from falling out.

Cotter Pin

Locations

1-2012 Pt. # 52230

PAGE 1

1. Open carton and remove the Handles, Control Rod, Hardware pack, Wheels, and the

S25 from carton.

4. Install the flat washer onto the axle and slide to the lower

handle. Next, position the drive wheel onto the axle 2”

and install the three (3) knurled pins one into each slot

located between the hub and the axle as shown at the

right, coat the knurled pins with WD-40 or a light oil,

finish by sliding the wheel tight against the lower handle.

Now insert 1” cotter pin through axle, bend with pliers to

prevent cotter pin from falling out.

NOTE:

Included is extra set of Knurled Pins (S25-30003)

which should be saved for future use. These are wear items

and will need to be replaced, and are available to purchase

directly through our Parts department.

Advertising