Htck3623s, General pump – General Pump HTCK3623S User Manual

Page 9

Advertising
background image

The new bearings can be mounted cold with a press or rocker, supporting it on the lateral surface of the ring

nuts involved in press fitting with the rings. The press fitting operation can be facilitated by heating the

involved parts to a temperature between 250

o

-300

o

F (120

o-

150

o

C), ensuring that the ring nuts fit fully into

their seats.

Never exchange the parts in the two bearings.

GENERAL PUMP

A member of the Interpump Group

HTCK3623S

Page 9

A) Disassembly/Reassembly of the crankshaft without bearings replacement.

After having removed the side covers as indicated in point 2.1.1, check the conditions of the rollers and their

relative tracks. If all parts are in good condition, clean the components carefully with a degreaser and

redistribute lubricant oil uniformly.

The previous shims can be reused, taking care to insert them only under the indicator side cover.

Once the complete unit (indicator side flange + shaft + motor side flange)is assembled and the cover screws

have been tightened to the recommended torque, check that the rotation torque of the con-rod shaft - with

the con-rod disconnected - is a minimum of 3 ft.lbs. (4 Nm) and a max. of 4.4 ft. lbs.(4-6 Nm).

To bring the two side covers closer to the casing, it is possible to use 3 M6x40 screws for the first

positioning phase as indicated in fig. 6 and the screws provided for final fastening.

Shaft rotation torque (with the con-rod connected should not exceed 6 ft.lbs. (8 Nm),

B) Disassembly/Reassembly of the crankshaft with bearings replacement.

After having removed the side covers as indicated in point 2.2.2, remove the outer ring nut of the bearings

from the relative covers and the inner ring nut with the remaining part of the bearing from the two ends of the

shaft by means of a normal “pin punch” or a similar tool as indicated in figs. 8 and 9.

Ref 300935 Rev.A

09-13

Advertising