10. START UP AND RUNNING PROCEDURES

10.1 Before start up

Before start up make sure that the following conditions

have been complied with:

1. Suction line should be connected: the pump must

never run dry.

2. Suction line must be perfectly airtight.

3. Any ON-OFF valve in between the pump and water

source should be open and make sure the water

gets into the pump freely.

4. Set the pressure line in dump mode in order to let

the air in the pump get out easily thus facilitating

the pump priming.

5. Make sure all suction/delivery line connections are

fully tightened.

6. Joint alignment, belt tightening and PTO shaft

inclination tolerances should remain within the

values indicated by the transmission Manufacturer.

7. Make sure the oil level is correct using the dipstick

(1, Fig. 7) and the oil sight glass (2, Fig. 7).

GENERAL PUMP

A member of the Interpump Group

KF SERIES

Page 10

10.2 Starting up

1. When starting the pump up for the first time check for

proper direction of rotation.

2. Pump and motor/engine must start offload: set the

regulating valve to zero or set the pressure line in

dump mode by means of proper dumping devices.

3. During operation check the rotating speed, making

sure the speed does not exceed the rated value.

4. Before putting the pump under pressure let it run for

at least 3 minutes.

5. Before stopping the pump release the pressure from

the system by operating the dump device or by

releasing the regulating valve and reduce RPM to a

minimum (diesel applications).

Note: In case of feeding by a centrifugal pump, make

sure that the plunger pump starts only when the correct

inlet pressure is provided.

Note: In case the pump has not run for a long period

check the suction and delivery valves for scaling.