General pump, Screw calibration – General Pump T16A-18A-20A-22A User Manual

Page 18

Advertising
background image

GENERAL PUMP

A member of the Interpump Group

KT16A/18A/20A/22A SERIES

3. SCREW CALIBRATION

Screws are to be fastened exclusively using a torque wrench.

Description

Exploded View

Position

(From Owner’s Manual)

Fastening

Ft. Lbs.

Fastening

Nm

Cover Fixing Screw

9

7.4

10

Oil Discharge Plug

11

30

40

Piston Fixing Screw

27

14.8

20

Con-rod Fixing Screw

18

22.1*

30*

Valve Cover Fixing Screw

45

132.8***

180***

Head Fixing Screw

47

59**

80**

2nd PTO Flange Fixing Screw

96

107****

145****

* The con-rod cap fixing screws must be tightened at the same time respecting the

phases indicated on page 7.

** The head fixing screws (exploded position 47) must be tightened with a torque wrench respecting

the sequence shown in the diagram in fig. 34.

*** The valve cover fixing screws (exploded position 45 must be tightened with a torqe wrench

respecting the order shown in the iagram in fig. 34.

****To fix the 2nd PTO flange, use Loctite 243 blue, p/n F12006400.

Page 18

Ref 300942 Rev.A

03-14

Advertising