Forward – Reese 30852 RAIL KIT User Manual

Page 7

Advertising
background image

6.

Remove ground wire from the frame. Use an 18mm socket to remove all of the bed bolts. Then raise and support
the truck bed.

7.

Insert base rails as shown in the following steps (

Figures 10 through 13

). Refasten truck bed bolts after rails are

inserted. Torque bed bolts to 75 ft. lbs.

Fuel

Cell

Front Hat Channel

Rear Hat Channel

Forward

Rear Hat Channel

Front Hat Channel

Fuel

Cell

F

F

Axle

Axle

Exhaust

Exhaust

Step 1 : Slide the base rail system in

bet een the hat channels Lift and

Figure 10

Figure 11

F

r

a

m

e

F

r

a

m

e

Step 2 : Position the base rail system near

the rear hat channel as sho n so that it

between the hat channels. Lift and

position it so that it rests on the frame.

the rear hat channel as shown so that it

rests evenly on both sides of the frame.

8.

Loosely attach clamping brackets (5) to frame using 1/2” x 6.5” hex head bolts (6) and 1/2” lock washers (7). Hand
tighten keeping the flat portion of the bracket even on the bottom of the frame. (

Figure 12

). Be sure that the rail

holes align with holes in the bed.

Forward

Figure 12

5

7

6

30852IN – 16FEB11A

PCN14335

©2011 CEQUENT PERFORMANCE PRODUCTS, INC.

LITHO IN USA

7

Advertising