Reese 30073 RAIL KIT User Manual

Page 6

Advertising
background image

6

30073N – 13DEC06D

PCN9360

©2006 CEQUENT TOWING PRODUCTS, INC.

Litho in USA

8. Insert rails as shown in the following steps (

Figures 9 through 11

). Rails should be inserted flat side up.

Step 1 : Insert the first rail from the

drivers side wheel well above the

frame. Rest the rail on both chassis

frame rails (

Figure 9

).

Forward

Figure 9

F

r

a

m

e

F

r

a

m

e

Front Hat Channel

Rear Hat Channel

Fuel

Cell

Figure 11

Step 3 : Insert the second rail from

the drivers side wheel well above the

frame. Rest the rail on both chassis

frame rails (

Figure 11

).

Step 4 :

One rail should be rearward and the other rail forward. The rails should be
centered with both ends of each rail resting evenly on the frame. After rails are
inserted and in place the flanged area of the bed liner can be straightened with
vice grips or pliers, be sure to use a soft cloth before gripping flange to
prevent scratching. If flanged area is scratched immediately follow
manufacturer’s recommended method of touching up scratched area to
prevent rust or other corrosion.

Step 2 : Slide the rail rearward,

parallel with axle, resting on both

frame rails, and as close as possible

to the rear hat channel (

Figure 10

).

Figure 10

Advertising