Reese 30073 RAIL KIT User Manual

Page 7

Advertising
background image

7

30073N – 13DEC06D

PCN9360

©2006 CEQUENT TOWING PRODUCTS, INC.

Litho in USA

9. If there is a brake cable bracket located above the rear axle on the driver’s side of the frame, then disassemble and

remove the brake cable bracket (

Figure 12

). Do not discard the brake cable bracket it will be re-attached later.

Brake cable bracket

Truck bed

Frame mounting rails

Figure 12

10. If brake cable bracket was removed in previous step, then re-locate brake cable bracket to rail bracket through hole

given in the frame rail bracket using the original brake cable bracket hardware, tighten brake cable hardware with a

wrench (

Figure 13

). Do not attempt to re-attach brake cable bracket through chassis rail.

11. Loosely attach frame brackets to mounting kit rails using 5/8” X 1 1/2” long bolts, flat washer, and lock washers

(

Figure 14

). Tighten all mounting kit bolts to hand tight.

Front of
vehicle

Figure 13

Front of
vehicle

Brake cable bracket

Frame bracket

Figure 14

5/8” flat washer
4 places

5/8” lock washer
4 places

5/8” X 1 1/2”
long bolt
4 places

Front of

vehicle

WARNING:

DO NOT lubricate threads. It may cause bolt failure.

Existing slot on older
model truck frames.

Aligns with existing slot on
older models, hole must be
drilled in frame for 2008 and
newer models.

Advertising