Strider essential series, Sst-st70f-esb, Sst-st60f-esb – SilverStone ST60F-ESB User Manual

Page 5

Advertising
background image

STRIDER ESSENTIAL SERIES

04

SST-ST70F-ESB

Load

Light Load

Typical Load

Full Load

+5V

2.83A

7.06A

14.13A

+3.3V

2.83A

7.06A

14.13A

+12V

9.47A

23.68A

47.35A

-12V

0.05A

0.14A

0.27A

+5Vsb

0.45A

1.13A

2.25A

SST-ST60F-ESB

Load

Light Load

Typical Load

Full Load

+5V

2.57A

6.42A

12.83A

+3.3V

2.57A

6.42A

12.83A

+12V

7.99A

19.97A

39.93A

-12V

0.05A

0.13A

0.27A

+5Vsb

0.44A

1.11A

2.22A

3.4 Rise Time
DC output rise time is less than 20 mS at nominal line and full load.

3.5 Hold-up Time
DC +5V output maintains at least 16mS ,after power off , under 230V/50Hz
75%Load condition.

3.6 5VSB
5VSB is requierd for the implementation of PS-ON described above. 5VSB is
a standby voltage that may be used to power circuits that require power input
during the powered-down state of all power rails. The 5 VSB pin should deliver
5V ± 5% at a minimum of 2.5 A for PC board circuits to operate. Conversely,
PC board should draw no more than 2.5A maximum form this pin. This power
may be used to operate circuits such as soft power control.

3.7 PG-OK
PG-OK is a power good signal and should be asserted high by power supply
to indicate that the +5 VDC and +3.3 VDC outputs are above the under-voltage
thresholds of the power supply. When this signal is asserted high, there should
be sufficient mains energy stored by the converter to guarantee continuous
power operation within specification. Conversely, when either the +5VDC or
the +3.3VDC output voltage falls below the under-voltage threshold, or when
mains power has been removed for a time sufficiently long so that power supply
operation is no longer guaranteed, PG-OK should be deasserted to a low state.
See Figure 1 for a representation of the timing characteristics of the PG-OK,
PS-ON, and germane power rail signals.

Advertising
This manual is related to the following products: