Operation – IAI America RCA-E User Manual

Page 15

Advertising
background image

P. 12

8. Operation

8-1

Initial Screen During Power - UP

Once power is connected to the RC Controller and the controller PORT Switch is ON, power will be
supplied to the teaching pendant and operation will begin.

Once the power is installed, the LCD Display screen will display the latest teaching pendant software version
number.

Initial Screen during power installation

During this time, RS485 serial connections between controllers will occur.
Once the controller connection completes, the screen will automatically move onto the next
selection screen.

Confirming connection
IAI RC ST V. 1. 00

Advertising