1 step-by-step, Putting the l, Communication module into operation – IDEC FL1E SmartRelay User Manual

Page 13

Advertising
background image

L

ON

W

ORKS

® Communication Module User’s Manual

3-1

3. Putting the L

ON

W

ORKS

® Communication

Module into operation

A LONMARK certified application was loaded into the LON
module at the factory.

3.1 Step-by-step

1. Interrupt the voltage to the IDEC SmartRelay.

(The IDEC SmartRelay and its modules do not have
power switches.)

2. Mount the L

ON

W

ORKS

® Communication Module

3. Connect the power supply to the L

ON

W

ORKS

®

Communication Module.

4. Connect the LON bus lines to the L

ON

W

ORKS

®

Communication Module.

5. Remove the label with the Neuron-ID from the

L

ON

W

ORKS

® Communication Module and stick it on the

network plan at the L

ON

W

ORKS

® Communication

Module's installed location. (The Neuron-ID is also given
as a bar code on the label.)

6. Apply power to the IDEC SmartRelay and L

ON

W

ORKS

®

Communication Module.

7. If multiple L

ON

W

ORKS

® Communication Modules have

been installed, repeat Steps 1 to 6 for each L

ON

W

ORKS

®

Communication Module.

8. To log a L

ON

W

ORKS

® Communication Module in on a

LON network, you can either press the “Service” button
or enter the Neuron-ID directly in the LON using the
Installation Tool or by reading the label with a bar code
scanner.

9. The L

ON

W

ORKS

® Communication Module is then

registered in the LON database and ready for operation.

10. For further details regarding the LON installation, please

read the corresponding documentation.

Advertising