Plumbing – Airstream Safari User Manual

Page 72

Advertising
background image

F

PLUMBING

F - 9

Water Heater Bypass

For Normal Operation

Turn water heater by-pass valves to normal flow position. Shut off valve B - open

valves A and C.

For Winterizing (bypass position) close valves A and C, open valve B.

Valve access is:

19 Ft. Bambi and the 23 Ft.- under the corner bed, accessible from holes in the bed

top under the mattress.

20 Ft. is under roadside front dinette seat, remove the seat cushion and there are

holes in the seat base for access.

25 Ft. Sleep Six and 30 ft. models are assessed through the curbside rear exterior

access door.

25 Ft. F B is through the curbside front exterior access door.

25 ft A & B models are accessed through the roadside rear access door.

28 Ft. rear bed model is under the front lounge on the roadside. An access hole is

provided in the lounge top.

27 Ft. front bed model is under bathroom lavatory. Open the lavatory cabinet door to

access a drop down door. Open the drop down door to access the valves on the water

heater.

HOT WATER LINE

COLD WATER LINE

BYPASS
LINE

WATER
HEATER TOP

A

B

C

Cold
Water Inlet

Hot
Water Outlet

Advertising