Wiring, 1 2 3 wiring – LiftMaster LA412 Solar Powered Residential Gate Operator User Manual

Page 21

Advertising
background image

20

Mo

vin

g G

ate

Can

Caus

e

Injur

y or

Death

KEEP

CLEAR!

Ga

te m

ay m

ove

at

any

tim

e w

itho

ut pri

or w

arn

ing

.

Do n

ot le

t ch

ildre

n o

per

ate

the

ga

te o

r

pla

y in

the

ga

te a

rea

.

Thi

s en

tran

ce i

s fo

r ve

hic

les o

nly

Ped

est

rian

s m

ust

use

sep

ara

te e

ntra

nce

GATE 1

GRN

WHT

YEL

BLU

RED

BRN

F2

F6

U4

MAX

FUSE
OPEN

C13

C4

Z1

10A 32V

D1Ø

Z12

ACCESSORY

POWER

GATE 1

NC

GRN

WHT

YEL

BLU

RED

BRN

Insert the operator cable through the watertight connector mounted in the
bottom of the control box.

Select hole in bottom of the control box to be used for the operator cable.

CONNECT THE GATE OPERATOR (GATE 1) TO THE
CONTROL BOX

Insert the watertight connector into the bottom of the control box and tighten
with nut.

1
2
3

WIRING

» CONNECT THE GATE OPERATOR (GATE 1) TO THE CONTROL BOX

Operator Cable

Watertight Connector Nut

If installing one operator, proceed to page 25. If
installing two operators, continue to the next page.

Extend the operator cable and wires to the Gate 1 connector and connect
as shown.

Tighten watertight connector nut.

4

5

Terminal blocks can be
removed to simplify wiring.

Watertight
Connector

Nut

Operator Cable

1

2

3

4

5

Advertising