Junction box (model la412-s only), Wiring – LiftMaster LA412 Solar Powered Residential Gate Operator User Manual

Page 24

Advertising
background image

23

JUNCTION BOX

The following items are required to complete the junction box installation:
• 4 x 4 Junction Box with 3/4" NPT threaded port holes
• Screws
• PVC Conduit

Open the junction box by removing screws (4) and set aside.

Mount the junction box within 3 feet (0.9 m) of second operator.

Gate Operator (Gate 2)

Extension Cable

Within

3 feet (0.9 m)

Junction Box

Screws (4)

WIRING

» JUNCTION BOX (MODEL LA412-S ONLY)

Junction Box

Junction Box Cover

1

2

1

2

Route operator cable and extension cable through watertight connector nut and
watertight connector.

Insert cables and watertight connectors into the holes in the bottom of the
junction box (not provided).

Feed extension cable through PVC conduit and secure with nut.

Junction Box (not provided)

Watertight Connector

Watertight Connector

Extension Cable

Watertight Connector Nut

PVC Conduit

PVC Conduit

Watertight Connector Nut

Operator Cable

3
4

5

3

5

4

Nut

Nut

Advertising