25.8 Load Test Plan With Thumb Drive Menu

1.INTERNAL STORAGE

.

2.THUMB DRIVE

Figure 84.0 Load Test Plan Number With Thumb Drive Menu

a. Description: Allows the operator to load a test plan from either the internal memory or

from the thumb drive.

b. Origin: This menu is displayed after the operator selects menu option 1 (“Load Test Plan”)

from the “Test Plan With Thumb Drive Menu” (Figure 81.0).

c. Action Options: To load a test plan from internal memory press key number 1 or push

down the Control Knob. To load a test plan from the thumb drive press key number 2.
Selection of number 2 may be made by turning the Control Knob to 2 and pushing down
the Control Knob after number 2 is selected.