14 run another test menu, Figure 31.0, Run another test menu – Vanguard Tri-Phase User Manual
Page 45: Figure 31.0)
Advertising
TRI-PHASE OPERATING™ INSTRUCTIONS
45
13.14 Run Another Test Menu
RUN ANOTHER TEST?
1.YES
2. NO
3. REPEAT PREV. TEST
Figure 31.0 Run Another Test Menu
a. Description: Allows the selection of performing another test on the transformer, ending
testing, or repeating the previous test.
b. Origin: After the “Test Saved Status Display”. Refer to “Keep This Reading” section
c. Action Options: Press key number 1 (“YES”) or push down the Control Knob. Press key
number 2 to end the current test and advance to the “Save This Record Menu” (Figure
32.0). Selection of 2 may be made by turning the Control Knob. Push down the Control
Knob after 2 is selected.
d. Action To Perform: Select menu option 2 for this example.
Advertising