Warner Electric AT Brake–Major Service Repair Instructions for Sizes 25, 55, 115 User Manual

Page 8

Advertising
background image

8

Warner Electric • 800-825-9050

P-1405 • 819-0325

21. Reconnect the wires.

22. Your AT brake is now ready for its static test.

Apply DC voltage to the coil through the brake
control. The armature should pull against the
friction material face with an audible click.

23. Run the brake under its operating load.

24. Your AT brake might not achieve its full torque

until after a short “break-in” period. To break in
the brake, cycle it on and off under full load at
operating speed a minimum of ten times in
quick succession. (See note)

Your AT brake is now ready to run.

Note: Your application may require more
cycles to achieve full torque due to load and
RPM.

19. Tighten the hub set screws, on the shaft and

key per the following torque specifications:

Size

Torque

25

80 in.lbs.

55

160 in.lbs.

115

275 in.lbs.

20. Secure the torque arm to the brake. The

torque arm attachment must be flexible
enough to compensate normal shaft and
bearing runout without causing binding or side
loading to the brake.

Advertising