Yuh Dak SIC-A series User Manual

Page 24

Advertising
background image

7-2

After the vacuum pumping, connect the air pipe of the refrigerant

tank to the liquid filling thimble valve, and fill the refrigerant into the air
return pipe. Watch the change of the weight displayed by the electronic
scale, and stop filling the refrigerant immediately when receiving the
schedule weight.
In the condition of the starting up, the shown pressure of the high
pressure gage should be about 13 to 15 bar; and shown pressure of the
low pressure gage should be about 3 to 5 bar. Note: the temperature of
the environment should be

and the temperature of the frozen water

should be

The filled weight
of the refrigerant

The model
of the machine

The model
of the machine

The electronic scale

The coolants tank

filled weight

7. Service & Maintenance

The filled weight
of the refrigerant