IEI Integration NANO-9453 v1.0 User Manual

Page 84

Advertising
background image

NANO-9453 EPIC Motherboard

Page 66

o

When working with the NANO-9453, make sure that it is disconnected

from all power supplies and that no electricity is being fed into the system.

Before and during the installation of the NANO-9453 DO NOT:

Remove any of the stickers on the PCB board. These stickers are required for

warranty validation.

Use the product before verifying all the cables and power connectors are

properly connected.

Allow screws to come in contact with the PCB circuit, connector pins, or its

components.

5.2.2 Installation Checklist

The following checklist is provided to ensure the NANO-9453 is properly installed.

All the items in the packing list are present

The CPU is installed

The CPU cooling kit is properly installed

A compatible memory module is properly inserted into the slot

The CF Type I or CF Type II card is properly installed into the CF socket

The jumpers have been properly configured

The NANO-9453 is inserted into a chassis with adequate ventilation

The correct power supply is being used

The following devices are properly connected

o

IDE device

o

SATA drives

o

Keyboard and mouse cable

o

Audio kit

o

Power supply

o

USB cable

o

Serial port cable

o

Parallel port cable

The following external peripheral devices are properly connected to the

chassis:

o

VGA screen

Advertising