SaltDogg LS10 Liquid Spay System User Manual

Page 2

Advertising
background image

2

9049 Tyler Blvd. • Mentor, Ohio 44060

Phone (440) 974-8888 • Fax (800) 841-8003

www.saltdogg.com

1. Position 1/2-13 projection weld nuts on inside gusset surface and weld them as shown in FIG 1
and FIG 2. Follow welding order for Installation A or Installation B.

WELD PROJECTION WELD NUTS IN THESE LOCATIOS

FOR INSTALLATION B

WELD PROJECTION WELD NUTS IN THESE LOCATIONS

FOR INSTALLATION A

Fig. 1

2. Align channels #3026808 to hopper sill bottom edge and clamp to hopper cross channels. See
FIG 3 for channels positions and welding recommendations.

ALIGN NUT IN THE HOLE. WELD AROUND NUT.
PROTECT THREAD FROM WELDING.

Fig. 2

ALIGN CHANNEL EDGE WITH

SILL EDGE. CLAMP CHANNELS

IN THIS POSITION

REAR MOST NUT

WELD CHANNEL TO HOPPER

IN SHOWN LOCATIONS

WELDED NUTS

Fig. 3

Advertising