Progressive International Electronics Omega JR User Manual

Page 8

Advertising
background image

SYSTEM INSTALLATION

System Installation Requirements

In preparation for the Omega JR installation, ensure that the following requirements have been met.

1. Following the manufacturer’s installation instructions, install the dispensing equipment (pumps

and data distribution boxes.)

2. Test all dispensers in stand-alone (manual) mode.

3. On dispensers which have programmable identification numbers, ensure that the numbers are

set correctly. If multiple dispensers contain the same ID number, communication conflicts will
occur.

To ensure smooth system integration, it is recommended that the petroleum equipment service
technician for the account be available to resolve dispenser-related issues.

Description of Omega JR Components

Omega JR systems are made up of the components listed below. Using this checklist, identify and
familiarize yourself with each of the components in your shipment.

C

OMPONENT

C

HECKLIST

Omega JR Main Box – wall transformer is attached

Brand-specific DBox(es) – as many as 2 boxes which communicate with

the appropriate brand(s) of fuel dispenser with attached wall transformer

Serial cable(s) – standard 6-foot cable which connects Omega JR to DBox

Omega JR Installation Manual

DBox Installation Manual

Omega JR General Specifications

Physical Size

7.5” x 8.5” x 2”

Operating Temperature

32 to 120 degrees F

Storage Temperature

32 to 120 degrees F

Electrical Requirements

115VAC, 20 W Maximum (dedicated circuit)

Version 1.0

Page 2

February 2013

Advertising