Mount oit to panel – Maple Systems OIT4185A User Manual

Page 11

Advertising
background image

3. Route the communication cable to the PLC/host. Refer to the “OIT Cable

Routing” section for more information.

4. Connect the other end of the cable to the PLC/host and tighten the cable screws.

5. Connect the green shield wire from the cable to earth ground (chassis

ground) on the PLC. If this wire is not present, the ground connection was

made inside the connector.

1010-0104, REV 04

14

OIT3185A/4185A

PIN#

FUNCTION

1

TXD+

2

TXD-

3

CTS

4

RETURN

5

TXD

6

RXD

7

RXD-

8

RXD+

Figure 6 Port 1 Pin Outs

3.4. Mount OIT to Panel

STEPS

1. Gently position the OIT with the studs through the panel mounting holes.
2. Secure the OIT by installing the four #6-32UNC mounting nuts using a

5/16 inch socket wrench or nut driver.

CAUTION: Do not torque the 4 mounting nuts to over 15 pound-inches. Over

torquing can strip the threads or pull the studs loose.
RE-INSTALLING: Because the gasket will take a “set” to the panel, be sure to

re-install any OIT to the same panel cutout when a NEMA 4/12 seal is required.

1010-0104, REV 04

INSTALLATION MANUAL

11

Figure 3 OIT3185/4185 Panel Mounting

Advertising
This manual is related to the following products: