Installation, Important – Yokogawa YTA320 User Manual

Page 23

Advertising
background image

<4. Installation>

4-

IM 01C50B01-01E

4. Installation

IMPORTANT

• When performing on-site pipe fitting work that

involves welding, use care to prevent outflow

of the welding current into the transmitter.

• Do not use the transmitter as a foothold for

installation.

• For details of choosing the installation location,

refer to the guidelines outlined in Section 2.4,

“Choosing the installation location”.

• The mounting bracket shown in Figure 4.1 is

used for the transmitter and is installed on 50A

(2B) pipe.

It can be installed either on a horizontal pipe

and a vertical pipe or on a wall.

• To install the mounting bracket on the

transmitter, torque the transmitter lock screw (1)

to about 20 to 30N•m.

F0401.ai

Horizontal Pipe Mounting

Vertical Pipe Mounting

U-bolt nut

Spring washer

Horizontal pipe

mounting bracket

U-bolt

Wall Mounting

Note: Wall mounting bolts are

user-supplied.

Transmitter

fastening bolt

U-bolt nut

Vertical pipe

mounting

bracket

Transmitter

fastening bolt

Spring washer

Spring washer

U-bolt

Bracket

fastening bolt

Bracket

fastening nut

• When using a horizontal pipe mounting bracket

• When using a vertical pipe mounting bracket

Figure 4.

Mounting the Transmitter

Advertising
This manual is related to the following products: